Motor
transducer
Charging hopper
Magnetic stirring
Evaporator barrel
Gas-liquid separator
Heavier component distillate
Lighter component distillate
Vestigital
distillate
Cold trap
11
12
13
14
15
16
17
18
19
Vacuum surge flask
Heating circulator
Low temp. circulator
Vacuum pump
Vacuum controller
In-flexible metal tubing
Out-flexible metal tubing
Out-silicone tube
In-silicone tube
-
Please according to the above picture to read below short path distillation machine
setup steps:1. Install magnetic driving equipment 1 on stainless steel stand, use screw to fix.
2. Install evaporator 2, connect evaporator top part with magnetic driving equipment, use flange to fix.
3. Install gas-liquid separator 3, connect separator top part with evaporator bottom, use flange to fix.
4. Install cold trap 4, connect cold trap right side with gas-liquid separator left side, use flange to fix.
5. Install vacuum surge flask 5, connect vacuum surge flask right side with cold trap left side, use flange to fix.
6. Install charging hopper at evaporator left side, use flange to fix.
7. Install stir motor 7 at the top of magnetic driving apparatus, use screw to fix on stainless steel stand.
8. Install transducer 8 on stainless steel stand.
9. Install collection bottle.
-
Above 9 steps could finish short path distillation machine basic installation, if you also have some problems please contact TOPTION engineer [email protected]