    Motor

    transducer

    Charging hopper

    Magnetic stirring

    Evaporator barrel

    Gas-liquid separator

    Heavier component distillate

    Lighter component distillate

    Vestigital 

    distillate

     

    Cold trap

    11

    12

    13

    14

    15

    16

    17

    18

    19

    Vacuum surge flask

    Heating circulator

    Low temp. circulator

    Vacuum pump

    Vacuum controller

    In-flexible metal tubing

    Out-flexible metal tubing

    Out-silicone tube

    In-silicone tube

  • Please according to the above picture to read below short path distillation machine
    setup steps:

    1. Install magnetic driving equipment 1 on stainless steel stand, use screw to fix.

    2. Install evaporator 2, connect evaporator top part with magnetic driving equipment, use flange to fix.

    3. Install gas-liquid separator 3, connect separator top part with evaporator bottom, use flange to fix.

    4. Install cold trap 4, connect cold trap right side with gas-liquid separator left side, use flange to fix.

    5. Install vacuum surge flask 5, connect vacuum surge flask right side with cold trap left side, use flange to fix.

    6. Install charging hopper at evaporator left side, use flange to fix. 

    7. Install stir motor 7 at the top of magnetic driving apparatus, use screw to fix on stainless steel stand.

    8. Install transducer 8 on stainless steel stand.

    9. Install collection bottle.


  • Above 9 steps could finish short path distillation machine basic installation, if you also have some problems please contact TOPTION engineer [email protected]
     24h/7days service.